Buildings & Campuses
The feeder can be whole and the operating room still on a generator.
Hospital, campus, and commercial facilities teams, and the utility that serves them.
What this sector is missing
Command can close a feeder event in under an hour and the damage inside the structure has already happened: an OR on backup, an elevator between floors, a line mid-cycle. Phase 02 takes the same stack one span further in — to the service and the panel.
Do not read a 23-minute or 58-minute story as a Kyber field result. Those are the shape of the gap. The published target on the feeder is under sixty minutes; the building still needs its own edge.
How Kyber is implemented here
/01
Installs at commercial voltage in the panel room — where utility power enters before it branches. It watches incoming quality, sheds non-critical load, transfers if a second path exists, and tells the BMS what class of event just arrived.
/02
At residential voltage in multi-unit buildings, isolates a unit fault so it does not take the elevator, corridor lighting, or fire panel with it.
/03
A campus or hospital complex can run a twin of internal topology alongside the utility feeder twin: which buildings are clean, which have islanded, which critical buses are still exposed.
What we will and will not claim
Into the BMS you already have
BACnet and Modbus are how most buildings already talk. Atlas should land in that interface, not invent a second glass the operator will ignore.
Who caused the sag
Timestamped quality logs decide whether a tenant’s damaged kit was a utility event or building wiring. That is an insurance and lease fact, not a dashboard flourish.
Load class from the meter, not a clipboard
Edge can learn downstream consumption patterns after install and use that as a first cut at shed priority. Facilities still own the criticality list.
Related structures
Hospitals, office towers, industrial plants, apartments, and small commercial are the Phase 02 industry pages.