Roadmap · Entering now

Electric Utilities

Find the fault before the complaint line does.

Distribution operators, control-room leadership, and engineering at IOUs, municipals, and cooperatives.

What this sector is missing

When a feeder faults, knowledge of it still travels slower than the outage. Customers lose power first. The desk finds out second. Someone starts calling third. A crew drives toward an approximate span fourth. That sequence has not fundamentally changed in decades.

Maps are partial. SCADA, AMI, OMS, and AVL do not share a live graph. SAIDI and SAIFI — average outage minutes and events per customer — are how regulators score the relationship. First-generation self-healing programs at large IOUs have cut duration on the order of 25 percent. Kyber’s design target, as an AI-native stack rather than an overlay, is 40 to 60 percent over baseline. That is a target, not a published field study.

How Kyber is implemented here

  1. /01

    Connects to the SCADA and AMI the utility already owns. Typical utility control rooms speak DNP3 and IEC 61850; those are the protocols Atlas is built to read. It does not require a new sensor fleet or a SCADA replacement. It reconstructs which switches are open, which feeders are hot, and which spans are isolated — and keeps that twin current.

  2. /02

    Classifies the event, writes an isolation and transfer sequence on the live graph, ranks crews by travel, skill, and material, and hands the desk a plan to approve rather than invent. Work orders can target the systems utilities already run — SAP Plant Maintenance and IBM Maximo are the common ones — when those interfaces are in scope.

  3. /03

    Sits at sectionalizing points and ties. Executes the isolate in under five milliseconds so customers on the healthy side of the open may never register the event. The truck is still rolling.

What we will and will not claim

  • Designed for CIP environments

    Anything that sits on a control network has to be built for NERC CIP, not painted on later. Kyber treats that as an architecture constraint. It is not a claim of a completed certification.

  • A risk register, not a calendar

    Atlas scores segments that are trending toward fault so maintenance can move off a fixed interval and onto estimated days-to-fail.

  • The rate-case argument

    Utilities recover plant in rate cases. A documented movement in SAIDI/SAIFI is how a technology spend becomes recoverable plant, not a science project.

  • Where we start

    One or two feeders, not the whole county. Prove the twin against the iron, then expand. See municipal utilities and rural cooperatives for the first-market motion.

Get started in Electric Utilities

Submit opens your email app with this request already written to kybertechnologies.inc@gmail.com. Press Send there.