Industry · Phase 08
Satellite Ground Stations
The pass is the SLA.
Commercial operators, Space Force site leads, government comms infrastructure.
What this sector is missing
If the chain dies during AOS, the contact is lost. For LEO that can be a missed command, a downlink you cannot reconstruct, or a collection that will not wait.
How Kyber is implemented here
/01
One health picture from antenna drive power through the RF chain to the processing racks.
/02
Fail to the backup path before the window, not during it.
/03
Millisecond isolate so a quality event on site power does not take the pass.
What we will and will not claim
Same stack as Phase 08
This is the site-level page for the Space & Satellite roadmap. JADC2 language belongs in a program conversation, not as a claim of alignment we have been paid for.

