Roadmap · Phase 04
Military & Defense
An installation that still islands by radio is not resilient.
Installation energy managers, facility engineers, and the DIU commercial pathway.
What this sector is missing
DoD policy asks bases to show they can run critical mission off the civilian feeder. Most cannot, because the microgrid is operated like a town desk: walk-down, phone, paper switching.
We do not sell a separately named “Military Edition.” Atlas, Command, and Sentinel adapt. Hardening, classification, and ATO are requirements the architecture is aimed at — not badges we claim to hold.
How Kyber is implemented here
/01
One twin for installation power, water, fuel, and comms: which buildings are hot, which generators are running, what fuel is left, which links are up. That replaces four consoles during a contingency.
/02
When commercial power drops, prioritize C2, comms, medical, and weapons storage; shed the rest to stretch fuel. The desk oversees. It does not invent the order under fire.
/03
Millisecond isolate on installation feeders so a fault in a warehouse does not take the TOC. Defense-grade packaging, crypto, and air-gap are design constraints for this phase — not a catalog of certified boxes on a website.
What we will and will not claim
DIU is the door, not a contract
Commercial Solutions Openings exist so dual-use stacks like this can enter faster than a traditional program of record. We align to installation energy resilience and OT security. We do not claim an award we do not have.
DARPA RADICS
Rapid Attack Detection, Isolation and Characterization Systems funded research in the same problem class Atlas occupies. Alignment with a published program is not a claim that Kyber was a performer.
Classification and ATO
Some sites mix classification levels. Segregating monitoring so a TS/SCI facility never shares a path with an unclassified one is a requirement facility managers will ask about. RMF/ATO is a process, not a logo on this page.
FOBs later
A portable twin for field-expedient power is a later application, after fixed installations. Inspection drones in Phase 09 are a related loop, not a substitute.