Hyperscale Data Centers
A PDU trip in an AI hall is not an inconvenience.
Hyperscale facilities, colos, and owner-operators of high-density compute.
What this sector is missing
A 10–20 MW training cluster is a small city’s load in a few rooms. Existing BMS/EPMS stacks alarm after the row is already dark or the silicon is already cooked.
One hour of hyperscale downtime is commonly priced in the hundreds of thousands to millions. In finance, a minute can clear a million. New interconnects are late; the feeders you have are therefore more precious.
How Kyber is implemented here
/01
Twins PDUs, UPS, cooling, generators, and the paths between them. A UPS battery that is dying writes a drift in charge and discharge long before a monthly test fails. Atlas is meant to see that drift.
/02
Move flexible load, open a cooler, or take a UPS off a stressed path before the trip. When the failure comes, its blast radius has already been cut.
/03
Millisecond isolate at the distribution edge so a bad PDU does not take the row. Same Sentinel family, data-hall voltage and density — not a fictional “PDU SKU” on a separate price list.
What we will and will not claim
PUE as a live number
Published efficiency programs have shown 10–20 percent PUE movement with better distribution awareness. That is the class of gain, not a Kyber case study.
Liquid cooling
Cold plates and immersion add loop temperature, flow, and exchanger health to the same graph. Ignore them and the electrical twin is only half the hall.
Behind-the-meter renewables
Where on-site generation exists, Command can prefer flexible training load when that generation is high. Economics, not a slogan.