Roadmap · Phase 08

Space & Satellite

A missed contact window does not come back on this pass.

Commercial constellation operators and Space Force ground infrastructure.

What this sector is missing

LEO contact geometry is unforgiving. A 90-minute orbit can mean the next chance is 90 minutes away — and the command, downlink, or collection is simply gone.

Ground chains are still watched as separate racks: antenna drive, HPA, LNA, processing, site power. GPS timing, cellular sync, and missile warning all sit on that chain.

How Kyber is implemented here

  1. /01

    Twins the site — pointing, power, RF chain, processing — and the relationship to the constellation: who can see whom, when, and what coverage dies if this site goes dark.

  2. /02

    If the primary is degrading before AOS, fail to the alternate and keep the pass. The anomaly is handled on the ground. The vehicle does not wait.

  3. /03

    Protective isolate on site power and the chain that feeds the antenna, in milliseconds, so a quality event does not take the pass with the rack.

What we will and will not claim

  • Space weather as an input

    NOAA’s Space Weather Prediction Center publishes the watches. Atlas should take those feeds and recommend taking sensitive paths down or onto backup before a GIC event, not after the supply sags.

  • JADC2 is a framing, not a contract

    Resilient space-to-ground is an enabler of Joint All-Domain Command and Control. We will use that language in a conversation with a program office. We will not claim we are on the program.

Get started in Space & Satellite

Submit opens your email app with this request already written to kybertechnologies.inc@gmail.com. Press Send there.