Roadmap · Phase 08
Space & Satellite
A missed contact window does not come back on this pass.
Commercial constellation operators and Space Force ground infrastructure.
What this sector is missing
LEO contact geometry is unforgiving. A 90-minute orbit can mean the next chance is 90 minutes away — and the command, downlink, or collection is simply gone.
Ground chains are still watched as separate racks: antenna drive, HPA, LNA, processing, site power. GPS timing, cellular sync, and missile warning all sit on that chain.
How Kyber is implemented here
/01
Twins the site — pointing, power, RF chain, processing — and the relationship to the constellation: who can see whom, when, and what coverage dies if this site goes dark.
/02
If the primary is degrading before AOS, fail to the alternate and keep the pass. The anomaly is handled on the ground. The vehicle does not wait.
/03
Protective isolate on site power and the chain that feeds the antenna, in milliseconds, so a quality event does not take the pass with the rack.
What we will and will not claim
Space weather as an input
NOAA’s Space Weather Prediction Center publishes the watches. Atlas should take those feeds and recommend taking sensitive paths down or onto backup before a GIC event, not after the supply sags.
JADC2 is a framing, not a contract
Resilient space-to-ground is an enabler of Joint All-Domain Command and Control. We will use that language in a conversation with a program office. We will not claim we are on the program.

