Roadmap · Phase 06
Transportation & Smart Cities
One event, five departments, zero shared twin.
City infrastructure directors, EOCs, transit and traffic operations.
What this sector is missing
A main break floods a tube. The tube dumps riders onto a street the water department just closed. The ambulance is late. That cascade is normal operations in a city without a unified layer.
Most “smart city” spend bought sensors and dashboards that do not issue a decision. Departments still call each other.
How Kyber is implemented here
/01
One live graph from the feeds the city already paid for: feeders, mains, signals, transit power, fiber. Not a prettier GIS. What is degraded, right now.
/02
On a break in an arterial: water gets a valve order, traffic gets a retiming, transit gets a reroute, hospitals in the polygon get a heads-up, public channels get a sentence. Seconds, not an 09:40 bridge.
/03
At junctions and intersections the node can watch power and, where a main is present, pressure — one physical install, the same edge loop.
What we will and will not claim
Into the EOC
A damage picture across systems, not sequential phone updates, is what emergency managers actually need in a storm.
IIJA and related grants
Federal grid-modernization and smart-infrastructure programs ask for a technology plan. A unified twin is the kind of plan those notices describe. It is not a promise that Kyber is a listed vendor on a given NOFO.

